The campus is almost complete with a variety of athletic improvements. These projects include:
Coyer Field Lighting Project - The campus installed lighting on Coyer Field which allows athletic events to be held into the evening hours to ease scheduling and offer more events if required.
Coyer Field Track & Field Repair - The main track was patched and repaired to maintain it until a near future replacement is possible. The long jump and steeple chase events were replaced.
Sports Arena Bleacher and Indoor Track Replacement - The bleachers were beyond their useful life and in need of replacement. The entire bleacher system was replaced and brought up to current codes. The indoor track was replaced at the same time.
Sports Arena Team Locker Room updates - The locker area of the Mens/Womens Hockey, Mens/Womens Basketball and Womens Volleyball were updated. These improvements include new lockers, equipment and finishes in all locker areas and updated HVAC in the mens hockey locker rooms.
Facilities Construction & Maintenance
Some content on this page is saved in PDF format. To view these files, download Adobe Acrobat Reader free. If you are having trouble reading a document, request an accessible copy of the PDF or Word Document.