The Facilities Master Plan 2013-2023 and the Building Conditions Assessment Survey form the basis for decisions about capital projects on our campus. In consultation with administration, the Campus Services Department and the State University Construction Fund (SUCF), the Facilities Planning Department develops the scope and scheduling of capital projects for a five-year period. An annual work plan is then developed. The pace of work is determined by many factors including the amount of state funding allocated, the availability of surge space and Buffalo State's academic calendar: to the greatest extent possible, projects are planned and executed in ways that minimize construction noise and other disruptions for our students. Large planning, design and construction projects are described on this website as project profiles.
Sometimes campus departments request smaller renovation projects. These requests are typically made by department heads, deans, or vice presidents, depending on the scope and anticipated cost of the work.
Facilities Construction & Maintenance
Some content on this page is saved in PDF format. To view these files, download Adobe Acrobat Reader free. If you are having trouble reading a document, request an accessible copy of the PDF or Word Document.