Moore Hall Existing Entrance
Moore Hall Existing Entrance
Architectural rendering of an interior space labeled "Lobby & Micro Market" with people walking and standing near a staircase.
Lobby & Micro Market
Architectural rendering of an interior space with people sitting at tables and on couches, labeled "Grab n Go Seating".
Grab n Go Seating 1
Architectural rendering of an interior space labeled "Grab n Go Seating", featuring various tables and chairs, a long counter with seating, and a view through large windows. Several people are sitting and working or talking.
Grab n Go Seating 2
Architectural rendering of a multipurpose room with round tables and chairs, labeled "Multipurpose Room".  The space features a patterned carpet, a projector screen, and a television. People are standing and talking in the room.
Multipurpose 1
This is an architectural rendering of a multipurpose room with round tables, chairs, a patterned carpet, projector screen, and television, where people are standing and sitting.
Multipurpose 2

Consultant: Kideney Architects, PC

Project budget: $24.1 million 

Design start: Summer 2022 

Construction start: Spring 2025

Construction Finish: Summer 2027

Moore Hall was built as a dining hall to serve Moore Complex and the Towers.  Currently, the building is being used by the custodial services, property control, and sustainable programs offices, which are being relocated to Karner Hall.  

The facility and housing master plans indicate that Moore Hall should be returned to student life use.  The campus performed a program study to determine the best uses for this building. The new design includes, food service, multipurpose programming space, lounge space, and Moore Complex resident office space. The building is intended for use by all students, faculty, staff, and visitors.