During construction of the Science and Math Complex, the campus gave up an outdoor competition field temporarily. Buffalo State has recently conducted a comprehensive study to determine the best location for the NCAA-regulation replacement field. The broader objective of the study was to envision a destination outdoor athletic and recreation complex. The study was completed by CHA and recommended a 3-4 phased project.
Phase 1 construction will replace the lost field. It will include a press box, bleachers, scoreboard, sound system, lighting and concessions.
Facilities Construction & Maintenance
Some content on this page is saved in PDF format. To view these files, download Adobe Acrobat Reader free. If you are having trouble reading a document, request an accessible copy of the PDF or Word Document.